Two-party signed record of every mechanic authorized to sign work under the CRS. QC inspector signs first, then the mechanic. Once both are signed, the entry is immutable.
β³ Awaiting Your QC Signature-
π Awaiting Mechanic Signature-
β Completed Roster-
Sign as QC Inspector
-
By signing below, you acknowledge that this mechanic is authorized to perform and sign work under the repair station's certificate, per FAA Β§145.161.
Your cert info on file will be captured at sign time.